Main Entrance Gates Expo 2020
Client: Arabtech / Expo 2020 / Turner and Townshend
Year: 2019
Project: Main Entrance Gates Expo 2020
Work Location: Expo 2020 Dubai
Description: Installation of the main structures by transportation of each individual element of the three main gates, which was carried out successfully utilising low bed flat trailers and nine mobile cranes with manpower and specialist rigging for the installation of all elements, as per the client and consultant requirements
Cranes: 9 x 70 ton cranes with manpower for the installation of the above scope of work activities, 3 x low bed trailers with specialist rigging and lashing.