Etihad Arena
Client: Miral and BAM contractors
Year: 2018
Project: Etihad Arena
Work Location: Yas Island, Abu Dhabi
Description: Steel installation package of large components for the main structure of the arena, and facade install with allocated manpower was carried out successfully as per the clients set requirements.
Cranes: 2 x 100 ton cranes, 2 x 50 ton cranes and manpower